Floor Slab Section Detail

Alternative floor slab detail.
Floor slab section detail. 1 16mmø top bot. This section of construction details includes. 4 10 2012 10 a problem with 2. The reinforced concrete floor slab is kept free of the perimeter walls.
Use iecc section 405. Section at vertical joint. The tee bar is plug welded to the continuous bronze mullions. Top section back and apply the fab tape 4 back and parallel to the edge of the bottom section.
Floor slabs may also resist upward soil or hydrostatic pressure loadings. For slabs openings in floor slabs as shown below. In this section several typical slab on grade sections are illustrated and described. There are many different soil conditions and corresponding slab designs.
This page is about how to build a thickened edge concrete slab on grade fpsf footing on soil with a high water table to prevent frost heave by first installing drainage below the slab. Slab on grade foundation detail design. This section shows two different conditions. Smooth out any gaps or voids while applying the tape.
2d blocks of architectural details different construction concrete steel metal structures composite building details composite floor slabs steel structures foundations retaining and supporting walls. Stripping of forms and shores shall be as follows. All concrete must be deposited vibrated and cured in accordance 17 50 mpa 40 00 mpa 1. Provide supplementary reinforcement at small unframed long 0 208m o c.
The bronze tee bar is bolted to the steel angles. These cad drawings include more than 100 high quality dwg files for free download. Concrete slab on grade grade beam detail fig 1 dwg concrete slab on grade grade beam detail fig 2 dwg. The mesh reinforcement in the slab is placed in the top with 1 covers.
Correct slab insulation detail 21. The steel structure is used to support the curtain wall at every floor slab. 4 2 slab on grade construction details. The suspended reinforced concrete slab is tied into the external capping beam.
Figures 4 9 through 4 11 and 4 15 show configurations with insulation on the exterior surface of the foundation. Upward soil pressures may be applied to the floor slab in situations where it is acting as a matt foundation and the building point loads on the foundation results in an upward pressure on the floor slab. Many smith drains are regularly furnished with a flanged body and a combination top flash ing collar which can be used to clamp the waterproof membrane. The details associated with this section of the bedg on the.
The slab is constructed on well compacted granular fill crushed stone or marl. 17 day 21 day 3 day 1 day 3. Related slab on grade foundation pages. Floor r value basementc wall r value slabd r value depth crawl spacec wall r value e402 1 1.