Floor Waste Requirements Vic

Plumbing regulations 2008 the plumbing code of australia pca is adopted.
Floor waste requirements vic. Class 2 3 or class 4 part of a building in apartment buildings residential buildings such as motels and boarding houses and residential parts of commercial buildings it is necessary to install floor wastes in bathrooms and laundries if a bathroom or. Floor wastes are required in large food manufacturing premises in premises where the large amounts of liquids are used or in areas where significant wet cleaning is required. Bathroom floor waste regulations. 13 17 showers 13 17 1 individual showers an individual shower shall be fitted with a minimum dn 80 grate or channel grate and shall be connected by a an untrapped wastepipe not smaller than dn 40 to a floor waste gully.
Residential wet area floor wastes ib 061 2016 the intent of this industry bulletin is to raise awareness of key issues surrounding the installation of floor wastes in wet areas and grading to the floor waste. Zone 3 is the area within a horizontal radius of 2 4m outside of zone 2. The aim of this technical solution is to clarify the requirements for the provision of floor waste gullies in urinal compartments and other wet areas see figures 1 2 and 3. Zone 2 is the area within a horizontal radius of 60cm outside zone 1 and a height of 2 25m from the floor.
Www vba vic gov au page 1 of 3 floor waste gullies in urinal compartments and. The floor waste gully is to dispose of water spillage and wash down water a minimum dn 50 riser may be used. Key issues non compliant waterproofing requirements and incorrect grading of floors in wet areas. Wet area rooms of class 2 3 part 4 buildings require floor wastes regardless of the type of shower only to prevent the potential for damage to other sole.
There are several things to consider in determining if a floor waste needs to be installed. In the above situations the floor is required by the ncc to be graded to the floor waste to prevent water overflow from penetrating to other occupancies or public spaces in the same building. For a class 1 buildings the bca through as 3740 requires a floor waste be provided within the shower area. We ve all seen bathroom floor waste systems but when are they required and when are they optional.
Floor wastes floors flushed with water or hosed down must be graded and a floor waste installed so that the water drains to a drainage system. Class 1 buildings. Floor wastes are not required in wet area rooms of class 1 buildings unless the area contains an unenclosed shower in which case the shower waste doubles as the floor waste. Plumbing regulations 2008 the plumbing regulations 2008 state that the.